首页|环境新闻|法庭内外|非诉项目|学术探讨|法律文书|案例选编|政策法规|环保产业|长三角动态|环保法律论坛
你的位置:首页 > 学术探讨 > 论文选辑 > 正文
本站搜索
How to Locate an Electro-plating Plant in Shanghai
关闭窗口 日期:2006年11月30日11时 来源: 作者:Eric Xie 编辑:eplawyer
   Generally speaking, Shanghai has tough restricts in establishing the electro-plating plants at present. If a company wants to locate a  manufacturing plant concerning about electro-plating in the Shanghai area,the company should comply with the environmental laws, rules, policies and stands of both China and Shanghai levels as follows:
1laws and rules
Environmental Protection Law of the P.R.C
Evaluation of Environmental Effects Law of the P.R.C
Law of the P.R.C on the Prevention and Control of Water Pollution
Law of the P.R.C on the Prevention and Control of Atmospheric Pollution
Law of the P.R.C on the Prevention and Control of Environmental Noise Pollution
Law of the P.R.C on the Prevention and Control of Environmental Pollution by Solid Waste
Stipulation for Environmental Protection Design of Construction Projects
Management Rules on Environmental Protection for Construction Projects in Shanghai,
Rules on Noise Control over Stationary Sources in Shanghai,
Rules on enforcing Evaluation of Environmental Effects Law of the P.R.C in Shanghai
 
2Discharge Stands
Shanghai Integrated Sewage Discharge Standard (DB31/199-1997)
Largest Amount of First-Class Pollutants Allowed by Law (mg/l)
Sequence number
Pollutants
largest amount
1
mercury
0.02
2
alkyl mercury
0
3
0.1
4
chrome
1.5
5
hexavalent chrome
0.5
6
0.5
7
plumbum
1.0
8
1.0
9
benzopyrene
0.00003
10
Beryllium
0.005
11
Argentine
0.5
12
1Bq/L
13
10Bq/L
14
2.0
15
0.1
16
1.0
17
5.0
 
Largest Amount of Second-Class Pollutants Allowed by Law (mg/l)
 
Sequence number
Pollutants
largest amount
1
pH
6-9
2
chroma (extension rate)
50
3
 
seston
 
70
Twostage effluent treatment plant in countryside
20
4
 
BOD5
25
Twostage effluent treatment plant in countryside
20
5
 
CODcr
100
Twostage effluent treatment plant in countryside
60
6
petroleum
5.0
7
Animal and vegetable oils
10
8
0.5
9
0.5
10
1.0
11
 
ammonia nitrogen
 
10
Twostage effluent treatment plant in countryside
10
12
fluorid
10
 
Integrated Exhaust Gas Discharge Standard of the P.R.C
Appendix B is available for piston project.
Noise of Boundary of Industrial Enterprises Discharge Standard of the P.R.C
class
Daytime
Night
1st
55db
45db
2nd
60db
50db
3rd
65db
55db
4th
70db
55db
Note: 3rd   class is available in industrial zones.
 
According to the above all, the company should complete all the issues relating to environmental protection of project in the whole process as follows:
1、Check the location of project
Electro-plant enterprises should pay attention to several principles:
(1) Take all the factors into consideration such as air, water, soil in
the scope of location when making the project plan.
(2) Land for pollution treated facilities and land for main project should be chosen at the same time.
(3) There should be a rational distance between project location and the uptown as well as some necessary landscaping area.
(4) Exhaust should be installed in the wind inferior
(5) Industrial land should not be used for commercial residential building
(6) The waste water plant should be located in the industrial zone
2、Prepare for EIA Report
As far as the scope of project is considered, the company must prepare for the EIA report on first-level (there are other two levels, i.e. Assessment Form and Registration Form ). The written report on the evaluation of the environmental effects of project shall include the following:
  (1) a brief introduction to the construct project;
  (2) the existing environment of the construction project;
  (3) an analysis, prediction and assessment of effects that the
construction project may exert on the environment;
  (4) protective measures for the environment of the construction project and technical and economic demonstrations of the measures;
  (5) an analysis of the economic losses and benefits by the construction project to the environmental effects;
  (6) a proposal for monitoring the environment of the construction project; and
(7) a conclusion on the evaluation of environmental effects.
The report should be ratified by Shanghai Environmental Protection Bureau. The bureau should make decision in 60 days after receiving application.
3、Three Synchronization—design
The company should design the project in accordance with the EIA report and its official reply, write the specific part on environmental protection.
4、Three Synchronization—build
The company must apply for the permission of building in the night when the project is beginning;, and the permission of trial production when the building is completed. All the documents should be prepared according to the pertinent regulations in Shanghai.
5、Three Synchronization—operate
The company must write the report on final acceptance of the project, it could put into operation after getting the permission from pertinent apartments.
6、Apply for some licenses
(1) The registration on pollution emission
(2) The pollution emission license
(3) The certification for reaching the electro-plating standards in Shanghai
(4) ISO14000 and SA8000
 
The above all is just an outline of procedure, there might be little change based on the investment data and the latest policies in Shanghai. 
 
 
 
 
 
Eric Xie: One of  the leading lawyers on environmental protection in China,. Mr. Xie has got the master’s degree in economic law in the law school of Shanghai Jiaotong University, has extensive knowledge and experience on how to help foreign-oriented enterprises obey the Chinese and international environmental protection laws and rules, what’s more, Mr. xie has been keeping well touch with Shanghai Environmental Protection Bureau and some other related departments, could help the foreign-oriented enterprises to improve its EHS culture.
 
Room 4005, Tower 1
Grand Gateway
No.1 Hong Qiao Road,
Shanghai, 200030
People’s Republic of China
 
+86  21  6281 7258 Tel
+86  21  6281 7276 Fax